Foshan Metro Project
In the grand blueprint of Foshan’s urban rail transit construction, Foshan Metro Line 3 serves as an important transportation artery connecting the north and south.
Its safety and reliability are directly related to citizens’ daily travel and the development pulse of the city.
We are deeply honored to be able to serve asfire fighting equipmentsuppliers to contribute our strength to this landmark project.
?
?
Construction content
Foshan Metro Line 3 is approximately 69.5 kilometers long and has 37 stations. It is the backbone line connecting the central urban area with Daliang Ronggui Group, Beijiao Chencun Group and Shishan Group. In this project, our company carefully designed and manufacturedfire pump unitSuch equipment is widely used in fire protection systems of subway stations and interregional tunnels, mainly including but not limited to:
High efficiencyfire pump unit: Adopt advanced hydraulic design and high-efficiency motor to ensure that sufficient water can be quickly provided in emergency situations to meet fire extinguishing needs.
Intelligent control system: Integrate intelligent monitoring and remote control functions to realizefire pump unitReal-time monitoring and remote control of operating status improve emergency response speed.
Durable materials and workmanship:Select high-quality materials and combine with fine manufacturing processes to ensurefire fighting equipmentIt operates stably in complex and changeable subway environments and extends its service life.
?
Construction results
Improve subway safety level: Our companyfire pump unitThe successful application of other equipment has provided a solid guarantee for the fire safety of Foshan Metro Line 3. In an emergency, it can quickly start and effectively respond to emergencies such as fires to protect the lives of passengers and employees.
Enhance emergency response capabilities: The introduction of intelligent control systems has enabledfire fighting equipmentThe operation is more intelligent and automated. Once an emergency such as a fire occurs, the system can respond quickly and initiate corresponding fire-extinguishing measures, shortening response time and reducing losses.
Promote the development of urban rail transit: As an important part of urban rail transit construction, the improvement of the fire protection system is directly related to the safe operation of the entire subway line. Our companyfire fighting equipmentThe outstanding performance has laid a solid foundation for the smooth opening and operation of Foshan Metro Line 3, and further promoted the development of Foshan's urban rail transit industry.
?
?
During the construction of Foshan Metro Line 3, we always adhered to the principle of "quality first, safety first".
It has won high recognition from owners with its superb technology, high-quality products and considerate services.
In the future, we will continue to delve into the field of rail transit, provide safe and reliable fire protection solutions for more similar projects, and contribute more to the prosperity and development of cities.