Sewage pump installation instructions
2024-08-02
sewage pumpDetailed data on installation and maintenance is crucial to ensure proper operation and effective drainage of wastewater.
The following is aboutsewage pumpDetailed data and procedures for installation and maintenance:
1.Installation details
1.1 Location selection
- Environmental requirements:
- temperature range:0°C - 40°C
- Humidity range: ≤ 90% RH (no condensation)
- Ventilation requirements: Good ventilation, avoid direct sunlight and rain
- Basic requirements:
- basic materials: Concrete
- Foundation thickness:≥ 200 mm
- levelness:≤ 2 mm/m
- space requirements:
- operating space: Leave at least 1 meter of operation and maintenance space around the equipment
1.2 Pipe connection
- water inlet pipe:
- Pipe diameter: Should be no less than the diameter of the water inlet of the equipment
- Material: Stainless steel, PVC, PE, etc.
- Filter pore size:≤ 5 mm
- Check valve pressure rating:PN16
- Gate valve pressure rating:PN16
- Outlet pipe:
- Pipe diameter: Should not be less than the diameter of the equipment outlet
- Material: Stainless steel, PVC, PE, etc.
- Check valve pressure rating:PN16
- Gate valve pressure rating:PN16
- Pressure gauge range:0-1.6 MPa
1.3 Electrical connection
- Power requirements:
- Voltage: 380V ± 10% (three-phase AC)
- frequency:50Hz ± 1%
- Power cord cross-sectional area:Selected according to equipment power, usually 4-16 mm2
- Ground protection:
- Ground resistance:≤ 4Ω
- control system:
- Launcher type: Soft starter or frequency converter
- Sensor type: Pressure sensor, flow sensor, liquid level sensor
- control Panel: With LCD display to display system status and parameters
1.4 Trial run
- examine:
- Pipe connection: Make sure all pipes are firmly connected and there is no leakage.
- Electrical connection: Make sure the electrical connections are correct and well grounded
- add water:
- Amount of water added: Fill the equipment and pipes with water and remove the air
- start up:
- Start time: Start the equipment step by step and observe the operation status
- Operating parameters: Flow, head, pressure, etc.
- debug:
- Traffic debugging: Adjust the flow rate according to actual needs to ensure that water needs are met
- Pressure debugging: Debugging pressure according to actual needs to ensure system stability
2.Maintain detailed data
2.1 Daily inspection
- Running status:
- noise:≤ 70 dB
- vibration:≤ 0.1 mm
- temperature: ≤ 80°C (motor surface)
- Electrical system:
- Wiring firmness: Check whether the wiring is loose
- Ground resistance:≤ 4Ω
- piping system:
- Leak inspection: Check the piping system for leaks
- Blockage check: Check whether there is any blockage in the piping system
2.2 Regular maintenance
- lubricating:
- Lubricating oil type: Lithium-based grease
- Lubrication cycle: Added every 3 months
- clean:
- cleaning cycle: Clean every 3 months
- clean area: Equipment shell, pipe inner wall, filter, impeller
- Seals:
- Inspection cycle: Check every 6 months
- Replacement cycle: Replace every 12 months
2.3 Annual maintenance
- Disassembly inspection:
- Inspection cycle: Conducted every 12 months
- Check content: Wear of equipment, impellers, bearings, and seals
- Replacement parts:
- Replacement cycle: Replace seriously worn parts based on the inspection results.
- Replacement parts: Impeller, bearings, seals
- Motor maintenance:
- Insulation resistance:≥ 1MΩ
- Winding resistance: Check according to motor specifications
2.4 Records management
- Operation record:
- Record content: Equipment operating time, flow, head, pressure and other parameters
- Recording period:Daily record
- Maintain records:
- Record content: Contents and results of each inspection, maintenance and overhaul
- Recording period: Recorded after each maintenance
sewage pumpVarious faults may be encountered during operation, and understanding these faults and how to deal with them is crucial to ensuring the reliability of the sewage system.
Here are some common onessewage pumpFaults and how to deal with them:
Fault | Cause analysis | Treatment method |
pumpDoes not start |
|
|
pumpNo water comes out |
|
|
pumpNoisy |
|
|
pumpwater leakage |
|
|
pumpInsufficient traffic |
|
|
pumpNot enough pressure |
|
|
Control system failure |
|
|
Through these detailed faults and processing methods, you can effectively solvesewage pumpProblems encountered during operation ensure that it can operate normally during the sewage discharge process, thereby effectively meeting the user's drainage needs.